Discovery and Dependency Mapping
Find every server, application and connection so nothing is forgotten in the move.
Moving servers is risky when it is rushed. echoBitz plans and carries out migrations between offices, data centers, colocation and hosted platforms, mapping every dependency first and cutting over in controlled steps, with a rollback plan ready.
Careful planning first, then safe movement, then proof that everything works.
Find every server, application and connection so nothing is forgotten in the move.
A step-by-step plan with timings, owners and communication to your users.
Careful shutdown, packing, transport, racking and cabling of physical equipment.
Convert physical servers to virtual ones, or move virtual machines between platforms.
Copy data securely and prove that it arrived complete and unchanged.
Test every system after the move and stay on hand while your users settle in.
A clear, step-by-step approach that keeps you informed and avoids surprises.
Inventory systems and map dependencies.
Write the runbook, schedule and rollback.
Build the target and copy data ahead of time.
Switch in the agreed window and test.
Support users, tune and decommission the old.
We choose the migration method that gives you the least downtime for each system.
Every migration has a different driver, and the plan changes with it.
Your servers must move with the business to a new location.
Typical need: relocation plan and minimal downtimeReplacing an in-house server room with a professional data center.
Typical need: rack, power, network and cutover planOld servers are out of warranty and risky to keep.
Typical need: new hardware with data and apps movedToo many underused servers costing power and effort.
Typical need: virtualization and consolidation planA contract ending or provider changing.
Typical need: orderly exit and move to the new platformShifting servers to AWS, Azure or Google Cloud.
Typical need: assessment and staged cloud migration“A migration succeeds in the planning. The weekend of the move should be the boring part.”
Everything being moved and what depends on what.
Detailed steps, owners, timings and rollback.
The new servers or platform ready before cutover.
Proof that data was copied completely.
Checks that every system and connection works.
New diagrams and settings after the move.
We reduce risk by planning every step and rehearsing what can go wrong.
Every migration has a written runbook, tested copies of your data and a rollback path. If something does not behave as expected at cutover, we can step back to the old system quickly.
Cutovers timed around your business.
Before and after, written down.
Backups before every major step.
We stay with you after go-live.
Questions about moving servers? Here are the answers clients ask most before starting with echoBitz.
Talk to an ExpertA few servers can move in a weekend after planning. Larger environments are moved in phases over several weeks. The planning stage determines the real timeline.
We aim for minimal downtime by copying data in advance and switching during a short agreed window. Critical systems can often be moved with only a brief interruption.
We keep the original system intact until the new one is proven, and prepare a rollback plan so we can switch back quickly.
Yes. P2V migration converts physical servers into virtual machines, which are easier to back up, move and recover.
Yes. We manage shutdown, packing, transport, racking, cabling and power-up, and test everything after installation.
Yes. We can assess your servers and migrate suitable workloads to AWS, Azure or Google Cloud, either fully or as a hybrid setup.